01What is it?

PVoC (Pre-Export Verification of Conformity) is the pre-shipment conformity verification programme many African countries apply to imports. The product is assessed in the country of origin before loading.

02Why Does This Scheme Exist?

Pre-shipment conformity verification programmes are a common model adopted by many African countries, and the reason they are preferred is administrative capacity: rather than running large-scale market surveillance at its own border, moving the control to the POINT OF EXPORT ensures that non-compliant products never enter the country at all.

The model works like this: the product's conformity is verified by an independent body in the exporting country and BEFORE the goods are loaded; the result is tied to a certificate of conformity to be presented at customs. Goods cannot be cleared from customs without the certificate.

The burden of inspection varies with the history of the product and the supplier, and this is the programme's most important cost lever. A supplier exporting for the first time requires physical inspection and testing, while for a regular supplier that has registered its product or licensed its facility a document review may suffice. The initial investment therefore reduces the cost of subsequent shipments.

The certificate is SHIPMENT-SPECIFIC, and this is the source of the model's most widespread mistake: a certificate obtained for one shipment does not cover the next consignment. The process runs again for every consignment.

Enforcement is severe: for goods arriving without a certificate, the result in most countries is that the goods do not enter the country, are returned or attract a heavy fine, and there is as a rule no route to correction after shipment. The programme name, scope list, authorised bodies and exemption thresholds differ from country to country.

03Whose Obligation?

The application is mostly made by the exporter; the process is run in coordination with the importer and import permits are entered on the certificate.

04Required Documents

  • Test reports to the standards applied
  • Invoice and packing list
  • Importer details and import permits
  • The pre-shipment inspection record
  • The Certificate of Conformity (CoC)

05Process

  1. 01Scope DeterminationIt is determined which legislation and marking scope the product falls under in the target market. This step defines the entire process; getting it wrong wastes all subsequent work.
  2. 02Determining Applicable StandardsThe standards accepted by the market and any national deviations are identified. The same IEC standard may apply with different deviations in different markets.
  3. 03Establishing the Test PlanIt is assessed which part of existing test reports will be accepted; missing tests are planned. A CB Scheme report, if available, reduces retesting.
  4. 04Local Party and RegistrationIf the market requires an established representative, importer or applicant, this party is designated and the necessary registrations are made.
  5. 05Tests and Technical FileTests are conducted and the technical file is prepared. Some markets require testing to be performed within their own country.
  6. 06Certification or DeclarationDepending on the market's regime, a manufacturer's declaration is drawn up or a certificate is obtained from the authorised body; a factory audit is carried out if required.
  7. 07Marking and LabellingThe mark and label are applied according to the market's format and language rules. The language requirement is checked at customs in most markets.
  8. 08Shipment and CustomsIf a pre-shipment document is required, it is obtained; the document set to be presented at customs is completed.

06Points to Watch

  • The programme rests on assessment BEFORE shipment
  • Applying after loading creates additional cost, delay and the risk of penalties
  • The route is chosen according to shipment frequency
  • Each country's scope list and accepted standards differ

07Neighbouring Schemes and the Difference

  1. 01Per-shipment verification and product registrationProduct registration or a facility licence reduces the per-shipment inspection burden and cost; without registration, physical inspection and testing are required for every consignment.
  2. 02Pre-shipment inspection and customs controlThe inspection takes place in the exporting country before loading; what happens at customs is only document verification and a missing document cannot be completed afterwards.
  3. 03The difference between programme namesThe same model runs under different programme names in different countries; the scope, authorised bodies and exemption thresholds differ by country.
  4. 04The certificate of conformity and the product certificateThe shipment certificate of conformity is specific to that consignment; a product certificate is specific to the product and does not take the place of the shipment certificate.

08Scheme Detail

This page describes entry into the Africa (PVoC) market. The scheme itself — its scope, process, validity period and required documents — is covered in detail on the certification page.

Export Conformity Program (PVoC) Certification

09Other Marks in the Africa (PVoC) Market

10Frequently Asked Questions

This section's content is being prepared. The roadmap specific to your product and target market at the quote stage in writing.

The certification timeline varies with the product, the required test workload, sample shipping time and the authority's workload; for this reason, no duration in days or weeks is given on these pages. The main factors determining the timeline are: whether testing must be performed in the target country, whether a factory audit is required, the time to appoint a local representative, and the current maturity of the technical file. A realistic timeline for your product is provided in writing at the quote stage.

Market access regimes change frequently: scope lists are updated, transition periods are extended, new requirements are added. These pages describe the structure of the regime and who bears the obligation; the applicable scope and dates for your product are confirmed from the current legislative text at the quote stage.

Africa (PVoC) · PVoC roadmap for

Tell us about your product; we'll share the required steps, documents and timeline in writing.

We use cookies required for the site to work. With your permission we also add an analytics cookie to understand how pages are used. Cookie Policy