What Is Surveillance?
Manufacturing surveillance is the on-site monitoring that the production stages of the product are carried out in accordance with the specification and the inspection and test plan (ITP). The surveyor attends the hold and witness points, observes process parameters and verifies the records.
Why Is It Done?
The aim is to observe, as they happen, those process steps that cannot be verified once the product is finished. For special processes such as welding, heat treatment and coating, this is the only real assurance of quality.
Who Requests It?
- EPC contractors and project owners
- Buyers of pressure equipment and pipelines
- Energy and petrochemical investors
- Purchasers of critical structural fabrication
- Industrial organizations sourcing internationally
Scope of Surveillance
- Presence at ITP hold and witness points
- Material acceptance control and traceability marking
- Welding parameters, preheat, and interpass temperature
- Records of heat treatment cycles
- Dimensional control and assembly tolerances
- Witnessing of non-destructive testing and its reports
- Witnessing of pressure tests and functional tests
- Surface preparation and coating application
- Nonconformity records and corrective action tracking
- Final inspection and documentation package review
Related Standards
- ISO/IEC 17020
- ISO 10005
- EN 10204
- ISO 3834
- ISO 9712
Method and Equipment
- Dimensional measurement instruments
- Access to contact thermometer and temperature records
- Coating-thickness gauge
- Photographic recording equipment
- Weld seam gauges
Surveillance Process
- 1Defining Scope and CriteriaThe order specification, the inspection and test plan (ITP), the delivery schedule and the reporting frequency are agreed with the buyer.
- 2Supplier AssessmentThe supplier's quality system, capacity, subcontractors and past performance are reviewed; a risk level is assigned.
- 3Surveillance PlanBased on the risk level, the frequency of site visits, the hold and witness points and the reporting calendar are planned.
- 4On-site SurveillanceThe surveyor attends the works during manufacturing, performing document checks, process observation and witnessing of inspections.
- 5Progress and Schedule MonitoringProgress against the plan is monitored; the risk of delay is identified early and reported to the buyer.
- 6Managing NonconformitiesDeviations found are reported, corrective action is requested and its close-out is followed up.
- 7Shipment Release and Close-outThe final inspection and the documentation package are checked; release for shipment is granted and a close-out report is issued.
Surveillance Report
- Details of the survey company, the surveyor and the buyer
- References to the order, the specification and the ITP
- Date of the visit and scope of the surveillance
- Findings of the document check
- Stage of manufacture and progress status
- Inspections and tests witnessed
- Nonconformities found and the status of corrective action
- Assessment of the schedule and the risk of delay
- Photographic records
- Recommendations for the next surveillance visit
- Specification and ITP references
- Hold/witness points visited
- Witnessed tests and their results
- Process parameter observations
- Nonconformities and closure status
- Shipping release statement
Limits of the Report
Surveillance does not remove the supplier's responsibility and does not assume liability for the quality of manufacture. The surveyor reports what was observed during the periods spent on site; production during the periods of absence falls outside the report. A surveillance report is neither an acceptance statement nor a guarantee; the inspection and acceptance provisions of the contract remain in force.
Accreditation
Surveillance activities are carried out under ISO/IEC 17020, which requires the impartiality of the survey body, the competence of its personnel and the validity of the survey methods. The impartiality rule is decisive: a survey body may not be a party to the trade in, or the manufacture of, the goods it surveys. EUROLAB holds internationally recognised accreditation under ISO/IEC 17020, granted by accreditation bodies that are signatories to the ILAC mutual recognition arrangement; because accredited scope is defined per type of surveillance, it is confirmed in writing at the quotation stage.
Scope and authorisationsRelated Surveillance Services
Frequently Asked Questions
What is a special process, and why does it require surveillance?
These are processes whose outcome cannot be fully verified by subsequent inspection: welding, heat treatment, coating, bonding, and the like. Looking at the finished product does not reveal whether the process was performed correctly; therefore, the process itself must be observed while it is being carried out.
Does surveillance reduce the supplier's responsibility?
No, it does not. The surveyor observes and reports on behalf of the buyer; the supplier remains responsible for the quality of manufacturing and compliance with the contract. A surveillance report is not a statement of acceptance.
Is the surveyor present on site continuously?
This depends on the level of surveillance. On critical projects, continuous (resident) surveillance is applied; on others, visits are made at specific hold points. Manufacturing carried out while the surveyor is not present falls outside the scope of the report, and this is clearly stated in the report.
How is the independence of the surveillance body ensured?
Surveillance is carried out under ISO/IEC 17020, which requires impartiality and the prevention of conflicts of interest. The surveillance body cannot be a party to the design or production of the manufacturing it surveys.






