Loading

Australia / New Zealand · Global Market Access

Entering the Australian and New Zealand Market: RCM

Combines electrical safety, EMC and telecommunications requirements under a single mark.

Market
Australia / New Zealand
Site
Asia-Pacific
Mark
RCM

01What is it?

RCM brings electrical safety, EMC and telecommunications requirements together under a single mark. Behind it lie several regulatory regimes.

02Why Does This Scheme Exist?

The common conformity mark of Australia and New Zealand is the product of a reform bringing the previously separate electrical safety, electromagnetic compatibility and radio marks together under a single symbol. The aim was to establish a single arrangement rather than running several marks and several registrations for the same product.

The defining logic of the arrangement is REGISTRATION AND DATABASE. The mark is not granted by any body; the party placing the product on the market must be established in the country, register in a national database and enter the product into that database according to its risk class. Enforcement runs through that registration.

Electrical products are divided into risk classes and the burden of evidence rises with the class: for high-risk categories third-party certification and registration are mandatory, while for low-risk categories a supplier declaration of conformity and keeping the technical file ready may suffice.

The obligation rests not with the foreign manufacturer but with the RESPONSIBLE SUPPLIER established in the country. That party signs the declaration, makes the registration and must produce the technical file on inspection. A foreign manufacturer cannot take that obligation on itself; this directly affects the structure of the commercial relationship.

Standards are based on international standards but carry regional deviations: differences arising from supply voltage and frequency, the national plug-and-socket arrangement and climatic conditions are governed in national annexes and enter the test plan separately.

03Whose Obligation?

The mark may be used only by a RESPONSIBLE SUPPLIER established in Australia or New Zealand and REGISTERED in the national database. A foreign manufacturer cannot use RCM directly.

04Required Documents

  • Test reports to the AS/NZS standards
  • The declaration of conformity
  • The compliance folder
  • Responsible supplier registration details
  • The justification for determining the risk level

05Process

  1. 01Scope DeterminationIt is determined which legislation and marking scope the product falls under in the target market. This step defines the entire process; getting it wrong wastes all subsequent work.
  2. 02Determining Applicable StandardsThe standards accepted by the market and any national deviations are identified. The same IEC standard may apply with different deviations in different markets.
  3. 03Establishing the Test PlanIt is assessed which part of existing test reports will be accepted; missing tests are planned. A CB Scheme report, if available, reduces retesting.
  4. 04Local Party and RegistrationIf the market requires an established representative, importer or applicant, this party is designated and the necessary registrations are made.
  5. 05Tests and Technical FileTests are conducted and the technical file is prepared. Some markets require testing to be performed within their own country.
  6. 06Certification or DeclarationDepending on the market's regime, a manufacturer's declaration is drawn up or a certificate is obtained from the authorised body; a factory audit is carried out if required.
  7. 07Marking and LabellingThe mark and label are applied according to the market's format and language rules. The language requirement is checked at customs in most markets.
  8. 08Shipment and CustomsIf a pre-shipment document is required, it is obtained; the document set to be presented at customs is completed.

06Points to Watch

  • Certification is mandatory for Level 3 products
  • Compliance records are retained for a defined period and produced on request
  • CE reports overlap but national deviations must be met separately
  • For products within the scope of GEMS, energy registration is carried out separately

07Neighbouring Schemes and the Difference

  1. 01The mark and registrationThe mark is not a certificate; it is the visible face of the registration and the declaration. The mark cannot be used without registration.
  2. 02The difference between risk classesFor high-risk categories third-party certification and registration are mandatory; for low-risk categories a supplier declaration may suffice.
  3. 03The responsible supplier and the foreign manufacturerThe obligation rests with the party established in the country; a foreign manufacturer cannot sign the declaration or make the registration.
  4. 04Regional standards and international standardsSupply network, plug-and-socket and climatic deviations are governed in national annexes; where an international report does not cover them, it is completed.

08Scheme Detail

This page describes entry into the Australia / New Zealand market. The scheme itself — its scope, process, validity period and required documents — is covered in detail on the certification page.

Avustralya/Yeni Zelanda (RCM) Belgelendirmesi

09Frequently Asked Questions

This section's content is being prepared. The roadmap specific to your product and target market at the quote stage in writing.

The certification timeline varies with the product, the required test workload, sample shipping time and the authority's workload; for this reason, no duration in days or weeks is given on these pages. The main factors determining the timeline are: whether testing must be performed in the target country, whether a factory audit is required, the time to appoint a local representative, and the current maturity of the technical file. A realistic timeline for your product is provided in writing at the quote stage.

Market access regimes change frequently: scope lists are updated, transition periods are extended, new requirements are added. These pages describe the structure of the regime and who bears the obligation; the applicable scope and dates for your product are confirmed from the current legislative text at the quote stage.

Australia / New Zealand · RCM roadmap for

Tell us about your product; we'll share the required steps, documents and timeline in writing.

We use cookies required for the site to work. With your permission we also add an analytics cookie to understand how pages are used. Cookie Policy