Only a locally registered responsible supplier can use the RCM mark; a foreign manufacturer cannot use it directly.

Site
Asia-Pacific
Mark / regulation
1
Countries covered
2 countries
Countries coveredAvustralyaYeni Zelanda

01Entering This Market

The RCM (Regulatory Compliance Mark) combines electrical safety, EMC and telecommunications requirements under a single mark. The distinguishing feature of the regime is that only a responsible supplier resident in Australia or New Zealand and registered in the national database can use the mark; a foreign manufacturer cannot use RCM directly.

02Background to the Regime

Australia and New Zealand are two markets that have largely UNIFIED their conformity systems, and this makes it possible to handle the region through a single programme. A common mark brings electrical safety, electromagnetic compatibility and radio requirements together under one visible symbol, and common standards are published jointly by the two countries.

The defining feature of the regime is the logic of REGISTRATION AND DATABASE. The party placing the product on the market must be established in the country and must register in a national database; the product too is entered into that database according to its risk class. Enforcement runs through that registration.

Electrical products are divided into risk classes and the burden of evidence rises with the class: for high-risk categories certification and registration are mandatory, while for low-risk categories a supplier declaration of conformity and keeping the technical file ready may suffice. Which class the product falls in is established at the outset.

The obligation rests not with the foreign manufacturer but with the RESPONSIBLE SUPPLIER established in the country. That party signs the declaration, makes the registration and must produce the technical file on inspection; a foreign manufacturer cannot take that obligation on itself.

The structure of standards is based on international standards but carries regional deviations: differences arising from supply voltage and frequency, the plug-and-socket arrangement and climatic conditions are governed in national annexes. These deviations enter the test plan separately.

03Acceptance of Foreign Test Reports and Documents

  • Foreign test reports are accepted; the laboratory is required to be accredited and the report to cover the deviations of the regional standard.
  • A CB Scheme report markedly reduces test repetition; the national differences section is met separately.
  • Registration and declaration are done by the responsible supplier established in the country; no report substitutes for that obligation.
  • Radio requirements are tied to the regional frequency arrangement; a radio approval from another market is not directly valid.
  • National annexes relating to the supply network and the plug-and-socket arrangement enter the test plan separately.

04Defining Features of the Regime

  • RCM is a single mark, but multiple regulatory regimes stand behind it
  • Electrical products are divided into three levels by risk (Level 1, 2, 3)
  • Certification is mandatory for Level 3 products
  • Only a locally registered responsible supplier can use the mark
  • Compliance records (compliance folder) must be kept and made available on request
  • The mains supply is 230 V, 50 Hz; AS/NZS standards are IEC-based but have national deviations

05Local Representative and Responsible Party

Having a RESPONSIBLE SUPPLIER resident in Australia or New Zealand is mandatory: this party registers in the national database, obtains the right to use the RCM mark, and keeps compliance records. As a foreign manufacturer, you provide the testing and documentation; registration and legal responsibility rest with the local supplier.

06Marks and Regulations in This Market

07Entry Process

  1. 01Scope DeterminationIt is determined which legislation and marking scope the product falls under in the target market. This step defines the entire process; getting it wrong wastes all subsequent work.
  2. 02Determining Applicable StandardsThe standards accepted by the market and any national deviations are identified. The same IEC standard may apply with different deviations in different markets.
  3. 03Establishing the Test PlanIt is assessed which part of existing test reports will be accepted; missing tests are planned. A CB Scheme report, if available, reduces retesting.
  4. 04Local Party and RegistrationIf the market requires an established representative, importer or applicant, this party is designated and the necessary registrations are made.
  5. 05Tests and Technical FileTests are conducted and the technical file is prepared. Some markets require testing to be performed within their own country.
  6. 06Certification or DeclarationDepending on the market's regime, a manufacturer's declaration is drawn up or a certificate is obtained from the authorised body; a factory audit is carried out if required.
  7. 07Marking and LabellingThe mark and label are applied according to the market's format and language rules. The language requirement is checked at customs in most markets.
  8. 08Shipment and CustomsIf a pre-shipment document is required, it is obtained; the document set to be presented at customs is completed.

08Customs and Labelling

  • The RCM mark appears on the product or its packaging
  • The responsible supplier's registration information must be verifiable
  • Compliance records (test reports, declaration) are retained for a specified period
  • An English-language user manual is required
  • GEMS registration and labelling additionally apply to products within the scope of energy efficiency

09Common Mistakes

  • Attempting to use RCM without determining a local responsible supplier
  • Assuming CE test reports will be accepted directly; national deviations must be met
  • Incorrectly determining the product's risk level
  • Not keeping compliance records
  • Skipping energy registration for products within GEMS scope

10Calendar

The certification timeline varies with the product, the required test workload, sample shipping time and the authority's workload; for this reason, no duration in days or weeks is given on these pages. The main factors determining the timeline are: whether testing must be performed in the target country, whether a factory audit is required, the time to appoint a local representative, and the current maturity of the technical file. A realistic timeline for your product is provided in writing at the quote stage.

Market access regimes change frequently: scope lists are updated, transition periods are extended, new requirements are added. These pages describe the structure of the regime and who bears the obligation; the applicable scope and dates for your product are confirmed from the current legislative text at the quote stage.

11Frequently Asked Questions

Can I, as the manufacturer, affix the RCM mark myself?

Use of the mark depends on the registered responsible supplier based in Australia or New Zealand. As a foreign manufacturer you provide the testing and documentation, but registration and responsibility rest with the local supplier.

Can my CE report be used?

AS/NZS standards are mostly IEC-based, and tests done for CE overlap significantly. However, national deviations must be met and mains conditions verified; it is not accepted directly.

Australia / New Zealand roadmap for

Tell us about your product; we'll share the required steps, documents and timeline in writing.

We use cookies required for the site to work. With your permission we also add an analytics cookie to understand how pages are used. Cookie Policy