Japan · Global Market Access
Entering the Japanese Market: PSE
Electrical appliance safety; third-party certification is mandatory for diamond PSE.
- Market
- Japan
- Site
- Asia-Pacific
- Mark
- PSE
01What is it?
PSE is the mandatory conformity regime under Japan's Electrical Appliance and Material Safety Act (DENAN). Products are divided into two groups: diamond PSE (third-party certification mandatory) and round PSE (manufacturer declaration).
02Why Does This Scheme Exist?
Japan's electrical product safety arrangement divides the products within its scope into TWO LISTS, and that division determines the whole process. In categories deemed high risk, third-party conformity assessment is mandatory; in the other categories the manufacturer or importer makes its own declaration.
The mark for the two lists also differs: one is a diamond-shaped symbol and the other round. This means packaging and label design can only be finalised after the scope has been determined; a label printed with the wrong symbol stops the shipment.
The second defining feature of the regime is that the obligation is placed on the IMPORTER or the established seller. A foreign manufacturer cannot be the responsible party; the party established in the country is responsible for compliance and for keeping records and makes the business notification to the authority.
On the technical side, national supply network characteristics change the test plan: the voltage level, the existence of two different frequency regions in the country and the national plug and socket standard require additional assessment. A report obtained to an international standard is not sufficient if it does not cover these national differences.
In categories requiring third-party assessment a decision from a registered conformity assessment body is required and that decision is expected to be renewed periodically. The manufacturing facility also has certain registration and control obligations.
03Whose Obligation?
The obligation belongs to the importer or manufacturer ESTABLISHED IN JAPAN: the METI notification is made by that party. A foreign manufacturer cannot be the responsible party.
04Required Documents
- A test report to the Japanese technical specifications (J standards)
- For diamond PSE, the accredited body's certificate and the factory inspection record
- Details of the PSE-approved plug and cable
- Japanese label and user manual
- The METI notification record
05Process
- 01Scope DeterminationIt is determined which legislation and marking scope the product falls under in the target market. This step defines the entire process; getting it wrong wastes all subsequent work.
- 02Determining Applicable StandardsThe standards accepted by the market and any national deviations are identified. The same IEC standard may apply with different deviations in different markets.
- 03Establishing the Test PlanIt is assessed which part of existing test reports will be accepted; missing tests are planned. A CB Scheme report, if available, reduces retesting.
- 04Local Party and RegistrationIf the market requires an established representative, importer or applicant, this party is designated and the necessary registrations are made.
- 05Tests and Technical FileTests are conducted and the technical file is prepared. Some markets require testing to be performed within their own country.
- 06Certification or DeclarationDepending on the market's regime, a manufacturer's declaration is drawn up or a certificate is obtained from the authorised body; a factory audit is carried out if required.
- 07Marking and LabellingThe mark and label are applied according to the market's format and language rules. The language requirement is checked at customs in most markets.
- 08Shipment and CustomsIf a pre-shipment document is required, it is obtained; the document set to be presented at customs is completed.
06Points to Watch
- The supply is 100 V and there is a regional 50/60 Hz difference
- The use of PSE-approved plugs and cables is expected
- A CB report shortens the process once the national deviations are met
- The responsible party's details appear on the label
07Neighbouring Schemes and the Difference
- 01The difference between the two listsIn the high-risk category third-party assessment is mandatory and the mark is diamond-shaped; in the other category a declaration suffices and the mark is round. Determining the scope is the first decision.
- 02Electrical safety and radio approvalA product carrying a radio is subject to separate legislation and a separate approval arrangement; the safety mark does not satisfy the radio requirements.
- 03National differences and international standardsThe supply voltage, frequency regions and plug-and-socket arrangement are national; an international report is insufficient if it does not cover these differences.
- 04The manufacturer and the established responsible partyA foreign manufacturer cannot be the responsible party; the importer or established seller makes the declaration and keeps the records.
08Scheme Detail
This page describes entry into the Japan market. The scheme itself — its scope, process, validity period and required documents — is covered in detail on the certification page.
Japan Electrical Compliance (PSE) Certification09Other Marks in the Japan Market
10Frequently Asked Questions
This section's content is being prepared. The roadmap specific to your product and target market at the quote stage in writing.
The certification timeline varies with the product, the required test workload, sample shipping time and the authority's workload; for this reason, no duration in days or weeks is given on these pages. The main factors determining the timeline are: whether testing must be performed in the target country, whether a factory audit is required, the time to appoint a local representative, and the current maturity of the technical file. A realistic timeline for your product is provided in writing at the quote stage.
Market access regimes change frequently: scope lists are updated, transition periods are extended, new requirements are added. These pages describe the structure of the regime and who bears the obligation; the applicable scope and dates for your product are confirmed from the current legislative text at the quote stage.
Japan · PSE roadmap for
Tell us about your product; we'll share the required steps, documents and timeline in writing.