
ISO 9001:2026 revision is in the publishing phase
The draft was approved by member bodies in December 2025; the harmonised structure is retained, and an evolutionary update rather than a comprehensive rewrite is envisaged.
ISO 9001 is the international reference for quality management systems and the most widely certified management system standard in the world. The standard's periodic review begins with the technical committee assessing whether it is still fit for purpose; if a decision to revise is taken, the draft matures stage by stage through the votes of member bodies.
An evolutionary update means that the existing structure is preserved: the order of clauses and the basic logic stay in place and the requirements are sharpened against current subjects. For certified organisations this means not building the system from scratch but updating the existing system by working through the differences.
Once the publication date is fixed, accreditation bodies announce the transition period; certified organisations go through a transition audit within it. Leaving the transition to the final month means being unable to find a slot when audit calendars are at their tightest.
How an ISO revision proceeds
ISO standards are reviewed periodically. The process begins with the technical committee assessing whether the standard is still fit for purpose; if a decision to revise is taken, the draft matures stage by stage through the votes of member bodies.
The draft has a name and a voting threshold at each stage. The distance between the news that "a revision is coming" and that "a revision has been published" can therefore exceed a year; when planning, it is necessary to look at which stage has been reached.
What an evolutionary update means
An evolutionary update means that the existing structure is preserved: the order of clauses and the basic logic stay in place and the requirements are sharpened against current subjects.
The consequence for certified organisations matters: the system is not rebuilt but updated by working through the differences over the existing system. This is a gap analysis and a targeted update — not recertification.
How the transition will work
Once the publication date is fixed, accreditation bodies announce the transition period and certified organisations go through a transition audit within it. For management system standards this period has typically been applied as three years.
What experience shows is this: although the period looks generous, finding an auditor becomes harder towards the end. Combining the transition with a planned surveillance audit reduces both cost and schedule risk.
The information in this article relates to a process at the publication stage; once the definitive publication date and transition timetable are announced, your certification body's notice is what binds.
Which part of the system actually changes in a revision
The common structure of management system standards fixes the order of clauses: context, leadership, planning, support, operation, performance evaluation, improvement. In an evolutionary revision this skeleton stays in place.
Change typically concentrates in two places. The first is the context and risk clause: the standard requiring the organisation to bring current subjects (climate, digitalisation, supply chain fragility, ethics) into its context. The second is the expectation of evidence: requiring work that is already being done to be shown by records.
So the output of a gap analysis is usually not "write a new procedure" but "produce a record of existing practice". This is also generally where findings arise in an audit.
How a gap analysis is done
A gap analysis runs through a mapping table: the clauses of the new standard in the left column, the existing procedure and record meeting that clause in the right. The rows left blank are the work list.
The table's second function appears in the audit: when the auditor asks about a clause, the table shows which procedure holds the answer and search time falls.
The person carrying out the analysis must also know the previous edition of the standard; reading only the new text does not reveal what has changed and produces unnecessary work.
What to do?
- 1Follow the publication and transition timetable through your certification body.
- 2Carry out a gap analysis once it is published; address only the requirements that have changed.
- 3Consider combining the transition audit with your planned surveillance audit.
This article is for informational purposes and does not constitute legal advice. How a regulation applies to your product depends on the product's technical characteristics and target market; the exact scope can only be determined by examining the product.
